There are two types of settings you have to configure when you start using Version & Component Sync (VCS).
There are settings to configure when enabling the add-on and there are settings to configure when you create a project link.
To enable VCS, go to the JIRA administration at the top right of your screen and click on add-ons.
The VCS add-on is shown left on the add-ons page. Click on settings to go to the add-on settings page
Screenshot 4
|
|
Screenshot 2: |
|
|
|
After configuring the add-on settings, the second step is to create a project link.
Although the example below is focussed on synchronising Versions, the process works the same if you wish to synchronise components. |
Versions are propagated from one Master project to multiple Linked projects.
Given we have a Jira instance with a Master project (MAS), a Linked project 1 (LP1) and Linked project 2 (LP2), if we want to share versions from the MAS project, we will need to create project links to LP1 and LP2.
Select the project(s) you want to link to the Master project
Versions from Master will be propagated to selected project(s)
Screenshot 2
Make sure that you have Project Administrator permission (not just Jira System Administrator) for all projects you would like to make a project link with. If you do not have Project Administrator permission for a project, this project will not be shown as an option to make a project link with. |
Screenshot 1: |
|
|
|
|
|
|
|
There are a few considerations when creating a project link:
When creating a project link, you can choose between Full Synchronisation or synchronisation based on Specific Changes.
Version & Component Sync will apply changes to versions/components retroactively upon creating the project link for both synchronisation types |